Pallet change installation

  • TIA Portal V18

    Control software built on TIA Portal

  • GMP Documentation

    FDS / SDS /FAT and SAT validation and IQ validation

  • Engineering and Commissioning

    Wrote FDS, SDS and control software. Commissioned and validates installation and control system

  • Design of cabinets

    Designed 4 cabinets using EPLAN Pro Panel

  • Electrical engineering and installation

    Engineered and installed the electrical installation, cabling, load calculations and wiring/cabling runs

  • Built cabinets

    Selected purchased and built all components into a cabinet, including wiring and marking all components